Update 3 June 2010  

Construction progress of North Park Place PROJECT by End of June 3, 2010
ความคืบหน้าของงานก่อสร้างโครงการ ณ วันที่ 3 Զع¹ พ.ศ. 2553

 
 
 
Fence & NP signage
 
Mail box
Exercise Room
 
Exercise Room
 

Mock up unit progress type B4-1 floor 14th.

Mock up unit progress type A1-2 floor 14th.
   
Description % Overall Project Progress

% Condominium 17 stories condominium

  Structural works    
  Substructure 100% 100%
1. Basement level 2 100 100
2. Basement level 1 100 100
3. Underground water tank, WWT and RTP 100 100
  Super Structure    
1. Ground floor    
    - RC Slab 100 100
    - PT Slab 100 100
   - Wall & Column 100 100
2. 2nd Floor - 17th Floor    
    - PT Slab 100 100
   - Wall & Column 100 100
3. Top roof    
    - Slab 100 100
   - Water tank 100 100
  Architectural works 100% 100%
1. Brick wall (up to 17 th Floor) 100 100
2. Internal plastering & wall finishing
         (internal plastering up to 17th floor)
100 100
3. External plastering 100 100
4. Ceiling work 100 100
5. Timber flooring 100 100
6. Tiling works 100 100
7. Kitchen cabinet & kitchen appliances works 100 100
8. Aluminiumframe and glass 100 100
9. Sanitary fixture & shower screen 100 100
10. Railing and louver 100 100
  M&E work 100% 100%
1.Sanitary system 100 100
2. Electrical system 100 100
3. Fire protection system 100 100
4. Air condition & Ventilation system 100 100
5. Lift installation 100 100
 Overall progress (%) 100% 100%